AEIS
Report Tools

User guide

For the browser tools · 21 November 2026

How to set up the report tools and make each daily and weekly report. The tools run in Microsoft Edge or Google Chrome, read your own files and write the finished workbooks back into your folders.

1Setting up

What you need

  • A computer with Microsoft Edge or Google Chrome. Nothing is installed and no administrator rights are needed.
  • An account made by your administrator. You sign in by approving the request on your phone.
  • The folder where your reports are kept, on the computer or on SharePoint synced to it.

First opening

  1. Open the tools website and sign in.
  2. Choose your rig or site and pick its reports folder once. The browser remembers it.
  3. Missing folders, such as the month's folder, are made for you the first time they are needed.
  4. The Today page shows each tool with its state: Ready, Up to yesterday or the number of days behind.
The tools read and write files on your computer through the browser. Your reports do not leave your computer unless your folder is synced to your organisation's own cloud.

2Giving the tools their files

Every tool takes files the way they arrive:

  • Drag and drop files or whole Outlook emails onto the page.
  • Paste a WhatsApp message or a table copied from Excel.
  • PDFs are read in the browser, including scanned contractor reports where the text can be read.

Files are recognised by what is inside them, not only by their names. A manifest, a weighbridge tracker or a contractor's daily report is put in the right place even when its name is unusual.

3Waste transfer notes

Makes the waste transfer note for each truck that leaves site, ready to print.

  1. Paste the day's dispatch message. Trucks, registrations, waste types and bin counts are read from it.
  2. Drop the manifests. Each truck is matched to its manifest by registration, or by waste type and bin count when the registration is missing.
  3. Check the boxes. Green came from the source and passed every check, orange needs a look, red is missing. The reason sits under the box.
  4. Choose the signers. Names carry over from the last note; the arrow lists the last two.
  5. Print. A preview opens, then the browser's own print window.

A manifest number already used on any earlier note, in any workbook, is flagged.

4Daily waste report

Builds the daily drilling waste report for a well: waste generated, stored, dispatched, treated and its cost.

  1. Choose the well. The next report date that is due is filled in.
  2. Paste the waste storage line, the dispatch message and the equipment message.
  3. Build. The tool reads the weighbridge tracker for weights and treatment, and the manifests for numbers.
  4. Review the questions and the cost. Where the weighbridge and the message disagree, you choose which stands; the choice is remembered.
  5. Save. The report is written into the well's folder with your naming style.

Weighbridge weights and manifest numbers are copied exactly and cannot be typed over. A day with no dispatch is reported plainly as a day with no dispatch.

5Treatment unit daily report

Makes the daily operations report for each thermal treatment unit from the contractor's daily PDFs.

  1. Drop the contractor's PDFs for the day, or let the tool find them in the folder.
  2. Running hours, feed, recovered oil, water, solids, fuel and power are read from each PDF. A figure that cannot be read is set to 0 with a note, and the report still builds.
  3. Add generator hours and ash if needed.
  4. Save. A day with 0 operating hours is passed over and its cuttings carry into the next running report.

6HSE daily report

Keeps the daily HSE report: manpower, hours, kilometres driven, diesel, observations, drills and incidents.

  • Yesterday's values are filled in where they carry over.
  • A figure far from the usual is flagged under its box, measured against the last 14 days.
  • Drills are picked from a list, and the truck list is kept for the fleet system.

7Weekly SHEQ report

Adds up the HSE daily reports of every rig into the weekly workbook, Friday to Thursday or any dates you choose. Each figure can be traced back to the daily report and cell it came from.

8Printing and sharing

  • Print shows the sheet as Excel prints it: print area, column widths, borders, logo and lines.
  • Finished files keep your organisation's naming style, for example 2026-11-21 Daily Waste Report KGG01-P04 #12.xlsx.
  • Summaries can be sent to managers as figures only, without the files.

9Common questions

Do I need to install anything?

No. The tools run in the browser and can be installed as an app from the browser's menu if you want a shortcut.

What if a file is open in Excel?

Close it, then save again. The tools never write half a file, and two windows saving the same file take turns.

Where do the rules come from?

From your organisation's existing reports and templates. Each tool is checked against reports your team made by hand, field by field, before it is used.

Questions: hello@aeintelsol.com