AEIS
Solutions

Daily reporting

The daily report, built from what already came in.

Report Tools read the WhatsApp messages, contractor PDFs, manifests and trackers your team receives, check them against each other, and write the finished workbook in your template. In the browser, with nothing to install.

Dispatch · 21 Nov

UBK 412X cuttings 2 bins

UBL 087K cuttings 2 bins

UAZ 330M fluids 1 tank

FLATBED skips 3

Daily Waste Report · KGG-P04 #12
UBK 412X00010084477 860 kg
UBL 087K00010084518 120 kg
UAZ 330M00010084529 400 kg
FLATBED00010084606 530 kg
4 loads · 31 910 kgCost 4 212.00
2026-11-21 Daily Waste Report KGG-P04 #12.xlsx
5report types in use
0installs on company laptops
Exactweights and manifest numbers
Anysource: PDF, email, message or Excel
01

Paste the message, drop the files

Dispatch messages, Outlook emails, PDFs and Excel tables go straight onto the page. Each file is recognised by what is inside it.

  • Drag and drop or paste
  • Scanned PDFs read in the browser
  • Missing folders made for you
Drop files
Manifest.pdf
Dispatch.msg
Tracker.xlsx
Daily-report.pdf
ManifestDispatch messageWeighbridge trackerContractor report
02

Checks you can see

Every key box is coloured by how it was known: green from the source, orange to confirm, red missing. The reason sits under the box.

  • Manifest used before, on any report
  • Weighbridge against the message
  • Unusual figures against the last 14 days
0001008447From the manifest PDF
7 860 kgWeighbridge row 412
UBK 41?XClosest: UBK 412X
 No manifest received
03

Your template, your names

The finished workbook is your own template, filled in and named the way your team names files, then saved in the right folder.

  • Prints as Excel prints it
  • Signers carried over
  • Each report numbered in turn
Template.xlsx
2026-11-21 HSE Daily Report Rig 2.xlsx

Made to fit

Report Tools is set up around your organisation.

Your reports

Waste, treatment, HSE, production, maintenance or any report your team fills in every day.

Your sources

WhatsApp messages, contractor PDFs, weighbridge exports, trackers and emails.

Your checks

The cross-checks your reviewers already make, done before the report is saved.

Your machines

Locked-down company laptops: the tools need only a browser.

In use

Built first for a waste management contractor

The tools started on a drilling waste contract at oil field rigs: waste transfer notes for every truck, the daily drilling waste report for each well, treatment unit reports from the contractor's PDFs and the HSE daily report. Each was checked against the reports made by hand before it replaced them.

Want Report Tools for your organisation?

Tell us how your teams work today. We will show you how it would look with your rules and your names.

Talk to us